Exhibition Lane - Status Report week of 5/22/15

Work Preformed this Week:

  1. Framing upper level roof system.
  2. Framing upper level interior walls.
  3. Main level wall framing of garage walls.
  4. Set steel beam for upper level floor system above garage.
  5. Framing of upper level floor system above garage.
  6. Framing of upper level wall system above garage.
  7. Framing upper level roof system above garage.
  8. Backfilling around foundation walls.
  9. Prep and pour structural slab for great room area.
  10. Start 3” rigid insulation cold roof system build up on roof.

Rachel Lynn