Exhibition Lane - Status Report week of 5/22/15
Work Preformed this Week:
- Framing upper level roof system.
- Framing upper level interior walls.
- Main level wall framing of garage walls.
- Set steel beam for upper level floor system above garage.
- Framing of upper level floor system above garage.
- Framing of upper level wall system above garage.
- Framing upper level roof system above garage.
- Backfilling around foundation walls.
- Prep and pour structural slab for great room area.
- Start 3” rigid insulation cold roof system build up on roof.